Xilang station

Xilang

西塱
Platform 3 (Line 1 boarding platform)
Chinese name
Traditional Chinese西塱站
Transcriptions
Standard Mandarin
Hanyu PinyinXīlǎng Zhàn
Yue: Cantonese
JyutpingSai1Long5 zaam6
General information
LocationHuadi Avenue South(花地大道南)
Liwan District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Foshan Railway Investment Construction Group Co. Ltd.
Line(s)
Platforms7 (3 island platforms and 1 side platform)
Tracks5
Construction
Structure typeAt-grade
(Guangzhou Line 1)
Underground
(Guangfo Line/Foshan Line 1, Guangzhou Line 10)
AccessibleYes
Other information
Station code101 1001 2207 GF18
History
Opened
  •      Line 1: 28 June 1997 (1997-06-28)
  •      Line 10: 29 June 2025 (2025-06-29)
  •      Guangfo line: 3 November 2010 (2010-11-03)
Services
Preceding station Guangzhou Metro Following station
Terminus Line 1 Kengkou
Line 10 Huawei
towards Yangji East
Jushu Guangfo line Hedong
towards Lijiao
Future services
Fangcun
Terminus
Line 22 Nanjiao
towards Panyu Square

Xilang station (Chinese: 西塱站; Jyutping: sai1long5 zaam6; Cantonese Yale: Sāilóhng Jaahm [note 1]), formerly Guanggang station[1] because of nearby Guangzhou Iron and Steel's headquarters when planning,[2] is an interchange station between Line 1, Line 10, and the Guangfo line of the Guangzhou Metro, and also the southern terminus of Line 1 and the western terminus of Line 10. It started operations on 28 June 1997. It was situated at the underground of Huadi Avenue South[3] in Fangcun, Liwan District.[4]

During COVID-19 pandemic control rules from 29 May to 24 June 2021, services of Xilang station had been largely restricted, as all entrances and exits are closed, passengers can't embark or disembark at this station, and while the trains on both lines can still stop here, passengers can only transfer between both lines within the fare zone.[5] The entrance has reopened in the afternoon of 24 June.

The currently under construction Line 22 will serve Xilang station by the end of 2025 and become Guangzhou’s 2nd 4-line interchange station. North of Xilang station, Line 1 is connected to Xilang Depot and south of the station, Line 10 is connected to Guanggang New Town Depot.

Station layout

F3
Offices
- Offices
F2
Concourse
Line 1 Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Transfer passageways between Lobbies
G
Line 1 Platforms
Mezzanine Transfer passageway between  1  and  10 
Platform 5  1  termination platform(back to Xilang Depot)
Island platform, alighting passengers only
Platform 4
Platform 3
 1  towards Guangzhou East Railway Station (Kengkou)
Island platform, boarding passengers only
Platform 2
Platform 1
 1  towards Guangzhou East Railway Station (Kengkou)
Side platform, alighting passengers only
B1
Concourse
Guangfo Line Lobby Ticket Machines, Customer Service, Shops, Safety Facilities, Transfer passageways between Lobbies
B2
Guangfo Line Platforms
Platform 7  Guangfo  towards Xincheng Dong (Jushu)
Island platform, doors will open on the left
Platform 6  Guangfo  towards Lijiao (Hedong)
Line 10 Lobby Ticket Machines, Customer Service, Shops, Safety Facilities
B3 Buffer Area Station Equipment
B4
Line 10 & Line 22 (U/C) Platforms
Side platform, doors will open on the right for alighting passengers only
Platform 9  10  Termination Platform
Platform 8  10  towards Yangji East (Huawei)
Side platform, doors will open on the right for boarding passengers only
Platform 10  22  towards Panyu Square (Nanjiao) (U/C)
Island platform, doors will open on the left (U/C)
Platform 11  22  towards Fangcun (Terminus) (U/C)

Exits

Exit number Exit location
Exit A Huadi Daodaozhong
Exit B Huadi Daodaozhong
Exit D Huadi Daodaozhong
Exit F Huadi Daodaozhong
Exit J Huadi Daodaonan

References

  1. ^ Its Chinese name was 西朗站 before September 2018, due to lack of Unicode CJK Unified Ideographs support in early ticket system and signal system, where the 塱 is coded U+5871 in the block
  1. ^ simplified Chinese: 广钢站; traditional Chinese: 廣鋼站; pinyin: Guǎnggāng Zhàn; Jyutping: gwong2gong3 zaam6; lit. 'Guangzhou Iron and Steel Plant Station'
  2. ^ 地鐵三四號線六站更名 "廣州豐田"成站名 (in Simplified Chinese).
  3. ^ 花地大道南; Huādì Dàdào Nán; faa1dei6 daai6dou6 naam4; 'Flower Ground South Avenue'
  4. ^ Xilang
  5. ^ Li Tianyan (6 June 2021). "6月7日起,芳村区域所有地铁站停运". Guangzhou Daily.

23°03′52″N 113°13′56″E / 23.06444°N 113.23222°E / 23.06444; 113.23222