Huawei station (Guangzhou Metro)
Platform 2 (towards Xilang) | |||||||||||||
Chinese name | |||||||||||||
Simplified Chinese | 花围站 | ||||||||||||
Traditional Chinese | 花圍站 | ||||||||||||
| |||||||||||||
General information | |||||||||||||
Location | Intersection of Yulan Road (玉兰路) and a planned road Dongjiao Subdistrict, Liwan District, Guangzhou, Guangdong China | ||||||||||||
Coordinates | 23°3′34″N 113°15′34″E / 23.05944°N 113.25944°E | ||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
Line(s) | |||||||||||||
Platforms | 2 (2 island platforms)[a] | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | 1002 | ||||||||||||
History | |||||||||||||
Opened | 29 June 2025 | ||||||||||||
Previous names | Guanggang New Town (广钢新城) | ||||||||||||
Services | |||||||||||||
|
Huawei station (simplified Chinese: 花围站; traditional Chinese: 花圍站; pinyin: Huāwéi Zhàn; Cantonese Yale: Fāwàih Jaahm) is a station on Line 10 of the Guangzhou Metro. It is located under the intersection of Yulan Road and a planned road, south of Guanggang Xincheng Depot in Guangzhou's Liwan District. It opened on 29 June 2025.[1]
Station layout
This station is a three-storey underground station. The ground level is the exit, and it is surrounded by Yulan Road (southern extension of Chongwen 4th Road), Guanggang Xincheng Depot, planned TOD and other nearby buildings. The first floor is the concourse, the second floor is the platform for Line 10 and the third floor is the reserved platform structure for Foshan Metro Line 11.
G | - | Exits A, B, C, D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities |
L2 Platforms |
Platform 2 | 10 towards Xilang (terminus) |
Island platform, doors will open on the left | ||
Reserved for 10 branch (enclosed) | ||
Reserved for 10 branch (enclosed) | ||
Island platform, doors will open on the left | ||
Platform 1 | 10 towards Yangji East (Dongsha) | |
L3 11 Reserved Platforms |
11 reserved track area | |
Reserved Island platform | ||
11 reserved track area |
Concourse
There are automatic ticket machines and an intelligent customer service center at the concourse.
There are elevators, escalators, and stairs in the fare-paid area for passengers to reach the two platforms in different directions.
-
Concourse
Platform
The station has two island platforms located under a planned road, of which the outer side is used for the Line 10 mainline, and the inner side will be used for a planned branch line of Line 10. At present, the platform reserved for the Line 10 branch line on the inner side has been closed by a decorative panel wall and will not be used until the Line 10 branch line is completed. Therefore, in the eyes of passengers, the station is only equipped with a pair of side platforms.
Exits
The station has 4 exits.
Exit letter | Gallery | Exit location | Nearby | ||
---|---|---|---|---|---|
A | Hejing Road | ||||
B | Hejing Road | ||||
C | Hejing Road | Public Bus: Hejing Road West Stop | |||
D | Hejing Road | Public Bus: Huawei Station Stop |
History
Construction of the first phase of the enclosure structure was completed in August 2020, and the second phase completed in June 2021.[2] The roof slab was sealed in February 2022.[3] On 17 January 2025, the station completed the "three rights" transfer.[4]
During planning and construction, the station was called Guanggang New Town station according to the Guanggang New Town area in the north of the station. In April 2025, the Guangzhou Municipal Transportation Bureau announced the preliminary station names for Line 10, and since "Guanggang New Town" is not a standard place name, the authorities renamed the station to Huawei station after the original Huawei Village where the station is located.[5][6]
On 29 June 2025, the Line 10 main line platforms opened.[1]
Future development
Foshan Line 11
The planned Foshan Metro Line 11 will have a station here.[7] The two lines create an "L" shaped node transfer, and Guangzhou Line 10 has built reserved transfer nodes at the time of construction.
Guangzhou Line 10 branch line
The planned branch line of Line 10 will depart from this station into Foshan.[8] The branch platforms have been completed simultaneously with the construction of the station and will be opened after the opening of the branch line.
Notes
- ^ the reserved Line 10 branch platforms are enclosed on the inner side
References
- ^ a b 严艺文 (29 June 2025). "期待已久!街坊们见证广州地铁"X形"对角线开通" [Long awaited! Residents witness the opening of Guangzhou Metro's "X-shaped" diagonal line]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 29 June 2025 – via Sina Finance.
- ^ "广州10号线广钢新城站围护结构完工" [The enclosure structure of Guangzhou Metro Line 10 Guanggang New Town Station has been completed]. Beijing Urban Construction Group (in Simplified Chinese). 9 June 2021. Archived from the original on 19 June 2023. Retrieved 27 June 2025.
- ^ "广州10号线广钢新城站主体结构提前封顶" [The main structure of Guangzhou Metro Line 10 Station has been topped out ahead of schedule]. Beijing Urban Construction Group (in Simplified Chinese). 23 February 2022. Archived from the original on 19 June 2023. Retrieved 27 June 2025.
- ^ 郑慧梓 (4 February 2025). "交付"金钥匙"!广州地铁十号线首批四座车站"三权"移交" [Handing over the "golden key"! The "three rights" of the first four stations of Guangzhou Metro Line 10 are transferred]. Nanfang Daily (in Simplified Chinese). Archived from the original on 4 February 2025. Retrieved 27 June 2025.
- ^ "广州市交通运输局关于地铁十号线工程、十二号线西段工程车站初定名称意见征集情况的说明" [Guangzhou Municipal Transportation Bureau's statement on soliciting opinions on the preliminary names of stations for Metro Line 10 and Line 12 West Section]. Guangzhou Transportation Bureau (in Simplified Chinese). 16 May 2025. Archived from the original on 16 May 2025. Retrieved 25 June 2025.
- ^ "广州市民政局地名公告(20250516)" [Guangzhou Civil Affairs Bureau Place Name Announcement (20250516)]. Guangzhou Civil Affairs Bureau (in Simplified Chinese). 16 May 2025. Archived from the original on 16 May 2025. Retrieved 27 June 2025.
- ^ 刘钰滢 (30 June 2023). "多方回应佛山地铁11号线:广州段暂无明确动工计划" [Multiple parties responded to Foshan Metro Line 11: No clear construction plan for the Guangzhou section]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 20 July 2022. Retrieved 27 June 2025.
- ^ 李天研 (11 January 2019). "广州大学城科学中心有望通地铁 24号线成交通大动脉" [Guangzhou University City Science Center is expected to be connected to the metro, and Line 24 will become a major transportation artery]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 24 March 2019. Retrieved 27 June 2025 – via Phoenix.