Wuyangcun station
Platform 3 of Line 10 (towards Yangji East) | ||||||||||||||||||||||||||
Chinese name | ||||||||||||||||||||||||||
Chinese | 五羊邨站 | |||||||||||||||||||||||||
Literal meaning | Wuyang (Five Rams) Estate Station | |||||||||||||||||||||||||
| ||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||
Location | West side of the intersection of Siyou New Road (寺右新马路) and Guangzhou Avenue (广州大道) Dongshan Subdistrict, Yuexiu District, Guangzhou, Guangdong China | |||||||||||||||||||||||||
Coordinates | 23°07′11″N 113°18′53″E / 23.1198°N 113.3147°E | |||||||||||||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||||||||||||
Line(s) | ||||||||||||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||||||||||||
Tracks | 4 | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Station code | 512 1011 | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | ||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
|
Wuyangcun Station (Chinese: 五羊邨站; Cantonese Yale: Ńghyèuhngchyūn Jaahm), formerly Wuyang New Town Station (五羊新城站) during planning,[1] is an interchange station between Line 5 and Line 10 of the Guangzhou Metro.[2] It is located under the junction of Siyou New Road (寺右新马路) and Guangzhou Avenue (广州大道), in Wuyang New Town, Yuexiu District.[3][4] It opened on 28 December 2009.[5] On 29 June 2025, Line 10 started operations, and the station became an interchange station.
Station layout
The station is divided into two sections, Line 5 and Line 10, both under Siyou New Road, with Line 5 on the east side and Line 10 on the west side. It is surrounded by Guangzhou Avenue Middle, Siyou New Road, Siyou 2nd Road, Wuyang New Town and other nearby buildings.
Line 5
The Line 5 station is a three-storey underground station. The ground level is the exit, the first floor is the concourse, the second floor is the equipment level, and the third floor is the platform for Line 5.
G | - | Exits A-D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities, Restrooms, Baby Change Transfer passage towards 10 (U/C) |
L2 Equipment Area |
- | Station Equipment |
L3 Platforms |
Platform 2 | 5 towards Jiaokou (Yangji) |
Island platform, doors will open on the left | ||
Platform 1 | 5 towards Huangpu New Port (Zhujiang New Town) |
Line 10
The Line 10 station is a five-storey underground station. The ground level is the exit, the first floor is the transfer level between the exits and concourse, the second floor is the transfer passage to Line 5, the third floor is the concourse, the fourth floor is the equipment level, and the fifth floor is the platform for Line 10.
G | - | Exits E and F |
L1 | Transfer level | Towards concourse and exits Station Equipment |
L2 | Transfer passage | Towards 5 (U/C) |
L3 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities, Restrooms, Baby Change |
L4 Equipment Area |
- | Station Equipment |
L5 Platforms |
Platform 4 | 10 towards Xilang (Donghu) |
Island platform, doors will open on the left | ||
Platform 3 | 10 towards Yangji East (terminus) |
Concourse
The concourse is divided into two parts, Line 5 and Line 10, which are connected by a paid area transfer passage under construction. There are automatic ticket machines and an intelligent customer service center in both concourses. The Line 5 concourse also has convenience stores, lottery shops, other shops as well as self-service facilities such as automatic vending machines, shared charging stations and card vending machines.
There are elevators, escalators, and stairs in the fare-paid areas of the Line 5 and Line 10 concourses for passengers to reach the platforms.
There are restrooms and baby change in both the Line 5 and Line 10 concourses. The Line 5 concourse restrooms are located near Exit A, and the baby change is located near Exit D within the unpaid area. The Line 10 concourse restrooms and baby change are located next to the elevator in the paid area. There are also automated external defibrillators near Exit A for the Line 5 concourse and next to the station control center for the Line 10 concourse. It is worth mentioning that this station on Line 5 was the first underground station in Guangzhou to be equipped with restrooms when it was first opened.[6]
-
Line 5 concourse
-
Line 10 concourse
-
Line 10 blue transfer faregates
-
Line 5 platform
Transfer method
The station is designed with transfers in mind during the design Line 10, and a transfer passage will be constructed between the Line 10 concourse and the west side of the Line 5 concourse near Exit A.[7] Due to the slow progress of the construction of the transfer passage, it could not be opened in the initial stage of the opening of Line 10, and the station needs to implement a virtual transfer via an out-of-station interchange (OSI).[8] Similar to Pazhou station, which implemented the virtual transfer method earlier, passengers can be regarded as transferring at the same station within 30 minutes after exiting the station through the blue turnstile dedicated to transfer and will not affect the calculation of fares. Holders of single-journey tickets and other types of tickets can also use virtual transfers, and one-way tickets will not be collected when exiting the dedicated turnstile. However, security checks are still required when you re-enter the station. The walking distance between Exit A of Line 5 and Exit F of Line 10 is around 6 minutes.[9]
Platforms
The station has island platforms for both Line 5 and Line 10, in which both are located under Siyou New Road.[10] Line 5 is located on the upper floor on the east side, and Line 10 is located on the lower floor on the west side.
Exits
The Line 5 station has 4 exits, and Exit A is one of the few stations on Guangzhou Metro built before 2015 to feature elevators. The Line 10 station has 2 exits.
Exit letter | Gallery | Exit location | Nearby | ||
---|---|---|---|---|---|
5 Concourse | |||||
A | Siyou New Road | Siyou South Street Public Bus: Wuyangcun Station Stop (Eastbound), Wuyangcun Bus Terminus | |||
B | Guangzhou Avenue Middle | Guangzhou CPPCC Culture and History Exhibition Center Public Bus: Guangzhou Bridge North (Wuyangcun) Stop (Southbound) | |||
C | Guangzhou Avenue Middle | Nanfang Daily Newspaper Group Public Bus: Nanfang Daily (Yangji East) Stop (Southbound) | |||
D | Siyou New Road | Guangzhou Tieyi High School Public Bus: Wuyangcun Station Stop (Westbound), Metro Wuyangcun Station Stop, Metro Wuyangcun Station Bus Terminus | |||
10 Concourse | |||||
E | Siyou New Road | Guangzhou Tieyi High School Public Bus: Siyou New Road Stop (Westbound) | |||
F | Siyou New Road | Public Bus: Siyou New Road Stop (Eastbound) |
History
Line 5
In the 1997 "Guangzhou City Urban Rapid Rail Traffic Network Planning Research (Final Report)", the then Line 3 passed through Xicun and continued along West Huanshi Road to reach the area of Zhujiang New Town, and this station was set up on the way, which appeared as Wuyang New Town station at that time. Later, in the 2003 proposal, Line 3 was renumbered Line 5, and the station was confirmed to be one of the stations of the current Line 5, and construction was implemented.[11]
On 26 June 2006, construction of the station officially began with the full Line 5. On the eve of its opening, the station was named Wuyangcun station. On 28 December 2009, the station opened with the start of trial operation of Line 5.[12]
Line 10
In the early days of planning, Line 10 had a Siyou Xinmalu station on the west side of Yangji Estate. Due to the distance from Wuyangcun Station of Line 5, it was not designed as an interchange station. Later, the station was moved eastward to the east side of Yangji East, but because the demolition volume and construction restrictions of the scheme were large, the station continued to move eastward to its current location. Later, at the preliminary design review of Line 10, experts commented that the two stations should be considered for an interchange.[13] Subsequently, it was stated in the tender documents of the Line 10 EPC project that the Siyou Xinmalu station was located close to Wuyangcun Station of Line 5, and it was confirmed that there would be a transfer passage to connect the two stations.[7][14]
Line 10 station began to be enclosed in June 2019.[15] Construction of the first bored pile began in March 2020,[16] and construction of the enclosure structure began on 21 January 2021.[17] The station completed the "three rights" transfer on 21 April 2025.[18]
On 8 April 2025, the initial name of the stations on Line 10 was announced, and the station was regarded as an interchange station with the existing Wuyangcun Station of Line 5, therefore the name of Wuyangcun station was used.[19] However, due to the slow progress of the construction of the transfer passage, it is unable to be opened with the initial opening of Line 10, and the station needs to implement a virtual transfer via an out-of-station interchange (OSI).[8] On 21 May, part of the Line 5 concourse began to be enclosed to cooperate with the renovation works required for the implementation of the virtual transfer at the station. In the future, when the transfer passage is constructed, it is necessary to renovate Exit A, its attached restrooms and re-configure the scope of the paid area of the Line 5 concourse.
On 29 June 2025, the Line 10 station was opened.[20]
References
- ^ 广州地铁站以企业命名引来居民不满导致改名 (in Simplified Chinese).
- ^ Metro Line 5 Opens This December
- ^ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Traditional Chinese).
- ^ 09置业重点关注五号线地铁物业之越秀区 (in Simplified Chinese).
- ^ Guangzhou Metro line Five to Open in December 2009
- ^ 李佳文 (2009-12-16). "地铁首设地下公厕 位于五号线五羊邨站" [The first underground public toilet in the metro is located at Wuyangcun Station on Line 5]. New Express Daily (in Simplified Chinese). Archived from the original on 2022-06-03 – via Sina Corporation.
- ^ a b "广州市轨道交通十号线及同步实施工程总承包项目招标文件" [Guangzhou Metro Line 10 and Synchronous Implementation Project General Contracting Project Bidding Documents] (in Simplified Chinese). Guangzhou Public Resources Trading Center. 2018-09-20. Archived from the original on 2018-09-22. Retrieved 2025-07-08.
- ^ a b 李佳文 (2025-05-22). "广州地铁十号线年内开通,五羊邨站采取临时站外换乘" [Guangzhou Metro Line 10 will be opened this year, Wuyangcun Station will adopt temporary out-of-station transfer]. New Express Daily (in Simplified Chinese). Archived from the original on 2025-05-22. Retrieved 2025-07-08.
- ^ 李佳文 (2025-06-29). "新快报记者现场体验广州地铁十号线五羊邨站临时站外换乘通道,耗时约6分钟" [New Express Daily reporter experienced the temporary transfer channel outside the Wuyangcun Station of Guangzhou Metro Line 10, which took about 6 minutes]. New Express Daily (in Simplified Chinese). Archived from the original on 2025-06-29. Retrieved 2025-07-08.
- ^ "2005年度广州市地名命名更名变更(七)" [Name changes of Guangzhou places in 2005 (Part 7)]. Guangdong Provincial Department of Civil Affairs (in Simplified Chinese). 2006-02-22. Archived from the original on 2012-02-19. Retrieved 2025-07-08.
- ^ 唐慧杰 (2004-03-27). "广州地铁五号线规划方案出台 站点揭开盖头" [Guangzhou Metro Line 5 planning scheme released, stations unveiled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2009-03-07. Retrieved 2025-07-08 – via Sina Corporation.
- ^ 黄熹; 黄宙辉 (2009-12-28). "广州地铁五号线正式开通 约50万人受益" [Guangzhou Metro Line 5 officially opened, benefiting about 500,000 people]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2022-05-28. Retrieved 2025-07-08 – via Sohu News.
- ^ 李天研 (2018-06-05). "十号线换乘站 8座拟变10座" [Transfer station for Line 10: 8 stations to be converted into 10]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-06-03. Retrieved 2025-07-08 – via Sina Corporation.
- ^ 郑慧梓 (2023-10-25). "地铁10号线天河路至西塱段今日全贯通!寺右新马路站拟设2个出入口" [Metro Line 10 Tianhe Road to Xilang section is now bored through! Siyou Xinmalu Station plans to have 2 entrances/exits]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2023-10-25. Retrieved 2025-07-08.
- ^ 余秋亮 (2019-06-03). "广州地铁十号线寺右新马路站即将动工,如何绕行看这里!" [Guangzhou Metro Line 10 Siyouxinmalu Station is about to start construction. Here’s how to get around it!]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-01-07. Retrieved 2025-07-08.
- ^ "开足马力抓生产,复工复产见成效" [Working at full capacity to ensure production, and resuming work and production has achieved results]. China Railway Construction Bridge Engineering Group Co., Ltd. (in Simplified Chinese). 2020-03-13. Archived from the original on 2024-01-07. Retrieved 2025-07-08 – via Official WeChat Account.
- ^ "寺右新马路站围护结构工程顺利开工" [The enclosure structure project of Siyou Xinmalu Station started smoothly]. Guizhou Geological and Mining Foundation Engineering Co., Ltd. (in Simplified Chinese). 2021-01-22. Archived from the original on 2024-01-07. Retrieved 2025-07-08 – via Official WeChat Account.
- ^ "广州10号线项目顺利通过验收并完成三权移交" [Guangzhou Line 10 project successfully passed the acceptance and completed the three-rights transfer]. China Railway 11th Bureau Group Electrical Engineering Co., Ltd. (in Simplified Chinese). 2025-04-28. Archived from the original on 2025-04-29. Retrieved 2025-07-08 – via Official WeChat Account.
- ^ 李天研 (2025-04-22). "地铁十号线换乘站有变:新增五羊邨站换乘,取消石溪站换乘" [The transfer station of Metro Line 10 has changed: Wuyangcun Station has been added, and Shixi Station has been cancelled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-04-22. Retrieved 2025-07-08.
- ^ 李天研 (2025-06-29). "两条地铁新线"抢闸"开通,滨江东街坊:终于等到你!" [Two new subway lines were opened at the first opportunity, and residents of Binjiang East said: We’ve finally waited for you!]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-06-29. Retrieved 2025-07-08.