Takanekido Station
KS71 Takanekido Station 高根木戸駅 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Takanekido Station, June 2020 | |||||||||||
General information | |||||||||||
Location | 1-1-3 Narashinodai, Funabashi-shi, Chiba-ken 274-0063 Japan | ||||||||||
Coordinates | 35°43′36″N 140°02′05″E / 35.7266°N 140.0348°E | ||||||||||
Operated by | Keisei | ||||||||||
Line(s) | KS Keisei Matsudo Line | ||||||||||
Distance | 20.1 km (12.5 mi) from Matsudo | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Other information | |||||||||||
Station code | ○KS71 | ||||||||||
Website | Official website | ||||||||||
History | |||||||||||
Opened | 8 October 1948 | ||||||||||
Passengers | |||||||||||
2018 | 8,509 daily | ||||||||||
Services | |||||||||||
| |||||||||||
|
Takanekido Station (高根木戸駅, Takanekido-eki) is a passenger railway station located in the city of Funabashi, Chiba Prefecture, Japan, operated by the private railway operator Keisei Electric Railway.
Lines
Takanekido Station is served by the Keisei Matsudo Line, and is located 20.1 kilometers from the terminus of the line at Matsudo Station.
Station layout
The station consists of a single island platform, with an elevated station building.
Platforms
1 | ■ Keisei Matsudo Line | For Kita-Narashino, Shin-Tsudanuma, Keisei-Tsudanuma |
2 | ■ Keisei Matsudo Line | For Shin-Kamagaya, Yabashira, Matsudo |
History
Takanekido Station was opened on 8 October 1948 on the Shin-Keisei Electric Railway.
Effective April 2025, the station came under the aegis of Keisei Electric Railway as the result of the buyout of the Shin-Keisei Railway.[1][2] The move was completed on 1 April 2025.[3]
Passenger statistics
In fiscal 2018, the station was used by an average of 8,509 passengers daily.[4]
Surrounding area
- The station is located right next to the Æon market.
See also
References
- ^ "京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針" [Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations]. Chiba Nippo (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定" [Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025]. MyNavi Corporation (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "Hello! Matsudo Line 2025年4月1日、新京成線は京成電鉄松戸線へと生まれ変わります". Keisei Electric Railway (in Japanese). 25 February 2025. Retrieved 2025-03-31.
- ^ 千葉県統計年鑑(平成31年) [Chiba Prefecture Statistics (Fiscal 2018)] (in Japanese). Japan: Chiba Prefecture. 2019. Retrieved 11 August 2020.
External links
Media related to Takanekido Station at Wikimedia Commons
- Keisei Railway Station information(in Japanese)