Kunugiyama Station
KS80 Kunugiyama Station くぬぎ山駅 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
East Exit Kunugiyama Station in January 2023 | |||||||||||
General information | |||||||||||
Location | 5-1-6 Kunugiyama, Kamagaya-ken, Chiba-ken 273-0128 Japan | ||||||||||
Coordinates | 35°46′57″N 139°58′32″E / 35.7826°N 139.9755°E | ||||||||||
Operated by | Keisei Electric Railway | ||||||||||
Line(s) | KS Keisei Matsudo Line | ||||||||||
Distance | 9.6 km (6.0 mi) from Matsudo | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Other information | |||||||||||
Station code | ○KS80 | ||||||||||
Website | Official website | ||||||||||
History | |||||||||||
Opened | 21 April 1955 | ||||||||||
Passengers | |||||||||||
FY2017 | 3633 daily | ||||||||||
Services | |||||||||||
| |||||||||||
|
Kunugiyama Station (くぬぎ山駅, Kunugiyama-eki) is a railway station located in Kamagaya, Chiba Prefecture, Japan, operated by the private railway company Keisei Electric Railway. The former headquarters of Shin-Keisei Electric Railway as well as the rolling stock maintenance facility are also near the station.
Lines
Kunugiyama Station is served by the Keisei Matsudo Line, and is located 9.6 kilometers from the terminus of the line at Matsudo Station.
Layout
The station consists of a single island platform, with an elevated station building. The station is equipped with ticket vending machines and automatic ticket gates.
Platforms
1 | ■ Keisei Matsudo Line | For Shin-Kamagaya, Shin-Tsudanuma, Keisei-Tsudanuma |
2 | ■ Keisei Matsudo Line | For Yabashira, Matsudo |
History
Kunugiyama Station was opened on 21 April 1955 on the Shin-Keisei Electric Railway.
Effective April 2025, the station came under the aegis of Keisei Electric Railway as the result of the buyout of the Shin-Keisei Railway.[1][2] The move was completed on 1 April 2025.[3]
Passenger statistics
In fiscal 2017, the station was used by an average of 3633 passengers daily.[4]
Surrounding area
- Former Shin-Keisei Electric Railway head office
- JGSDF Camp Matsudo
- Kamagaya Nishi High School
See also
References
- ^ "京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針" [Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations]. Chiba Nippo (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定" [Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025]. MyNavi Corporation (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "Hello! Matsudo Line 2025年4月1日、新京成線は京成電鉄松戸線へと生まれ変わります". Keisei Electric Railway (in Japanese). 25 February 2025. Retrieved 2025-03-31.
- ^ 千葉県統計年鑑(平成30年) [Chiba Prefecture Statistics (Fiscal 2017)] (in Japanese). Japan: Chiba Prefecture. 2018. Retrieved 11 August 2020.
External links
Media related to Kunugiyama Station at Wikimedia Commons
- Keisei Railway Station information (in Japanese)