Motoyama Station (Chiba)
KS81 Motoyama Station 元山駅 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
West exit in January 2023 | |||||||||||
General information | |||||||||||
Location | 1-5-1 Gokō-Minami, Matsudo-shi, Chiba-ken 270-2212 Japan | ||||||||||
Coordinates | 35°47′25″N 139°58′33″E / 35.79028°N 139.97583°E | ||||||||||
Operated by | Keisei Electric Railway | ||||||||||
Line(s) | KS Keisei Matsudo Line | ||||||||||
Distance | 8.7 km (5.4 mi) from Matsudo | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Other information | |||||||||||
Station code | ○KS81 | ||||||||||
Website | Official website | ||||||||||
History | |||||||||||
Opened | 21 April 1955 | ||||||||||
Passengers | |||||||||||
2018 | 18,364 daily | ||||||||||
Services | |||||||||||
| |||||||||||
|
Motoyama Station (元山駅, Motoyama-eki) is a passenger railway station located in the city of Matsudo, Chiba Prefecture, Japan, operated by the private railway operator Keisei Electric Railway.
Lines
Motoyama Station is served by the Keisei Matsudo Line, and is located 8.7 kilometers from the terminus of the line at Matsudo Station.
Station layout
The station consists of two opposed side platforms, with an elevated station building.
Platforms
1 | ■ Keisei Matsudo Line | For Shin-Kamagaya , Shin-Tsudanuma, Keisei-Tsudanuma |
2 | ■ Keisei Matsudo Line | For Yabashira, Matsudo |
History
Motoyama Station was opened on 21 April 1955 on the Shin-Keisei Electric Railway.
Effective April 2025, the station came under the aegis of Keisei Electric Railway as the result of the buyout of the Shin-Keisei Railway.[1][2] The move was completed on 1 April 2025.[3]
Passenger statistics
In fiscal 2018, the station was used by an average of 18,364 passengers daily.[4]
Surrounding area
- GSDF Matsudo Base
- Matsudo City Daiyon Junior High School
See also
References
- ^ "京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針" [Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations]. Chiba Nippo (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定" [Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025]. MyNavi Corporation (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
- ^ "Hello! Matsudo Line 2025年4月1日、新京成線は京成電鉄松戸線へと生まれ変わります". Keisei Electric Railway (in Japanese). 25 February 2025. Retrieved 2025-03-31.
- ^ 千葉県統計年鑑(平成31年) [Chiba Prefecture Statistics (Fiscal 2018)] (in Japanese). Japan: Chiba Prefecture. 2019. Retrieved 11 August 2020.
External links
Media related to Motoyama Station (Chiba) at Wikimedia Commons
- Keisei Railway Station information(in Japanese)