Line 2 of the Nanning Metro a rapid transit line running from north to south Nanning. It opened on the 28 December 2017.[1] The eastern extension opened on 23 November 2020.[2]
Opening timeline
Segment |
Commencement |
Length |
Station(s) |
Name
|
Xijin — Yudong
|
28 December 2017
|
21.2 km (13.17 mi)
|
18
|
Phase 1
|
Yudong — Tanze
|
23 November 2020
|
6.3 km (3.91 mi)[3]
|
5
|
Eastern extension
|
stations
Station name
|
Transfer
|
Distance km
|
Location
|
English
|
Chinese
|
Zhuang
|
|
Xijin
|
西津
|
Sihcinh
|
|
0.00
|
0.00
|
Xixiangtang
|
Anji Coach Station
|
安吉客运站
|
Camh Yinhhek Anhgiz
|
3
|
|
|
Sulu
|
苏卢
|
Suhluz
|
|
|
|
Nanning No. 33 Middle School
|
三十三中
|
Samcibsam Cungh
|
|
|
|
Xiuxiang
|
秀厢
|
Siusiengh
|
|
|
|
Mingxiu Lu
|
明秀路
|
Roen Mingzsiu
|
5
|
|
|
Nanning Railway Station
|
火车站
|
Hojcehcan
|
1 NNZ
|
|
|
Xingning
|
Chaoyang Square
|
朝阳广场
|
Cauzyangz Gvangjcangz
|
1
|
|
|
Nanning Theater
|
南宁剧场
|
Nanzningz Gicangz
|
|
|
|
Jiangnan
|
Fujianyuan
|
福建园
|
Fuzgenyenz
|
|
|
|
Tinghong Lu
|
亭洪路
|
Roen Dingzhungz
|
|
|
|
Shizhuling
|
石柱岭
|
Sicuilingj
|
|
|
|
Jiangnan Coach Station
|
江南客运站
|
Camh Yinhhek Gyanghnanz
|
|
|
|
Dashatian
|
大沙田
|
Dasahdenz
|
4
|
|
|
Liangqing
|
Jianshe Lu
|
建设路
|
Roen Gensez
|
|
|
|
Shizitang
|
石子塘
|
Sizswjdangz
|
|
|
|
Jinxiang
|
金象
|
Ginhsieng
|
|
|
|
Yudong
|
玉洞
|
Yidung
|
|
|
|
Dongfeng Lu
|
东风路
|
Roen Dunghfungh
|
|
|
|
Yuling Lu
|
玉岭路
|
Roen Yilingj
|
|
|
|
Nafu Lu
|
那福路
|
Roen Nazfuz
|
|
|
|
Pingliang Overpass
|
平良立交
|
Bingzliengz Lizgyauh
|
3
|
|
|
Tanze
|
坛泽
|
Danzcwz
|
|
|
|
|
References
Public transportation in Guangxi (GX) |
---|
Nanning Metro | Lines in operation | |
---|
Under construction | |
---|
Planned | |
---|
|
---|
Guilin Rail Transit | |
---|
Liuzhou Rail Transit | |
---|
Transportation hubs | Int'l airports | |
---|
Railway stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|