Texas State Highway 150

State Highway 150
SH 150 highlighted in red
Route information
Maintained by TxDOT
Length35.937 mi[1][a] (57.835 km)
Existed1930–present
Major junctions
West end I-45 / FM 1374 near New Waverly
East end
Future I-69 / US 59 in Shepherd
Location
CountryUnited States
StateTexas
Highway system
SH 149 SH 151

State Highway 150 (SH 150) is an east–west highway in southeastern Texas beginning in New Waverly, starting at Interstate 45 and proceeds east going through Coldspring, where it turns southeast to Shepherd and terminates at Future Interstate 69/US 59.

Route description

SH 150 begins at an intersection with Interstate 45/FM 1374 just outside the city limits of New Waverly. The highway then enters New Waverly and intersects SH 75, with the two highways sharing a brief overlap, with SH 150 leaving SH 75 and turning east onto Gibbs Street near the town square, running concurrent with FM 1375 from SH 75 to Elmore Street. The highway leaves New Waverly near the intersection with Rogers Road. SH 150 travels through wooded areas and farmland of the Sam Houston National Forest and serves the unincorporated town of Old Waverly before reaching Coldspring near the southwestern shore of Lake Livingston.

The highway enters Coldspring at an intersection with FM 2025, where SH 150 also turns to the northeast, then turns east at SH 156 before turning south-southeast at FM 1514 in the town square. Leaving Coldspring, SH 150 turns in a more southeastern direction and continues to run through the Sam Houston National Forest. The highway turns back into a more eastern direction at FM 2666 then enters the town of Shepherd. In Shepherd, SH 150 is known locally as Main Street and intersects FM 222 and Loop 424 before ending at the southbound frontage road for US 59 (future Interstate 69).

History

SH 150 was designated on March 19, 1930 from US 75 (now SH 75) near New Waverly to Shepherd, replacing SH 45A and part of a branch of SH 45. On October 26, 1962, SH 150 was extended from US 75 to I-45.

Major intersections

CountyLocationmikmDestinationsNotes
Walker0.00.0
I-45 / FM 1374 west
Western terminus; I-45 exit 102
New Waverly1.21.9
SH 75 north
West end of SH 75 overlap
1.42.3

SH 75 south / FM 1375 west
East end of SH 75 overlap; west end of FM 1375 overlap
1.52.4
FM 1375 east
East end of FM 1375 overlap
6.210.0
FM 2693 east
8.113.0
FM 1097 west – Willis
San Jacinto10.416.7
FM 1725 south
Punkin14.222.9
FM 2693 west
Evergreen16.927.2
FM 945 north
West end of FM 945 overlap
17.027.4
FM 945 south – Cleveland
East end of FM 945 overlap
22.736.5
FM 2025 south – Cleveland, Double Lake Recreation Area
Coldspring24.339.1
SH 156 north – Point Blank
24.639.6
FM 1514 north (Byrd Avenue)
26.642.8
FM 222 north – Lake Livingston Dam, Camilla, Livingston
34.054.7
FM 2666 west
Shepherd35.457.0
FM 222 north – Lake Livingston Dam, Camilla, Livingston
35.757.5

Loop 424 to US 59 north – Livingston, Cleveland
36.158.1


Future I-69 south / US 59 south – Cleveland
Eastern terminus at south frontage road; US 59 exit 451; US 59 is the future Interstate 69
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Notes

  1. ^ The certified mileage given is shorter than the actual mileage as TxDOT considers SH 150 to be discontinuous at rather than concurrent with SH 75.

References

  1. ^ Transportation Planning and Programming Division (n.d.). "State Highway No. 150". Highway Designation Files. Texas Department of Transportation. Retrieved June 15, 2010.