Terminal 2 of Jiangbei Airport station

Terminal 2 of Jiangbei Airport

江北机场T2航站楼
Platform of Line 3
General information
LocationChongqing
China
Operated byChongqing Rail Transit Corp., Ltd
Line(s)     Line 3
     Line 10
Platforms4 (2 side platforms and 1 island platform)
Connections
Construction
Structure typeUnderground
Accessible5 accessible elevators
Other information
Station code3/39, 10/20
History
Opened30 December 2011 (2011-12-30)
(Line 3)
28 December 2017 (2017-12-28)
(Line 10)
Previous namesJiangbei Airport
Services
Preceding station Chongqing Rail Transit Following station
Bijin
towards Yudong
Line 3 Terminus
Terminal 3 of Jiangbei Airport
towards Lanhualu
Line 10 Yubei Square
Line 10
Rapid
Wangjiazhuang
Terminus

Terminal 2 of Jiangbei Airport, previously known simply as Jiangbei Airport, is an interchange station of Line 3 (straddle beam monorail) and Line 10 (heavy rail subway) of Chongqing Rail Transit in Yubei District of Chongqing Municipality, China.[1][2] The station opened in 2011 with Line 3 and was expanded in 2017 with Line 10, alongside changing to its current name to differentiate itself from the station at Terminal 3A of the airport.

It serves the airport terminals in which the station's name derived from (Terminals 2A & 2B of Chongqing Jiangbei International Airport) and its surrounding area, including Terminal 1 before its temporary closure since 2017.

Station structure

Line 3

There are 2 side platforms for Line 3 trains. Only 1 platform is in use as the station is the terminal station for North-bound trains. These trains switch beam (monorail tracks) from right to left before entering the station and stopping at the platform for South-bound trains, where they would terminate. Trains then let south-bound passengers board and would head for that direction (towards Yudong).

B1
Concourse
Exits 1-4, Customer service, Vending machines,
Transfer passage to      Line 10
B2
Platforms
Side platform
     Line 3 to Yudong (Bijin)
Track not in use
Side platform (not in use)

Line 10

An island platform is used for Line 10 trains travelling in both directions.

B1
Concourse
Exits 5-7, Customer service, Vending machines,
Transfer passage to      Line 3
B2
Platforms
     Line 10 to Wangjiazhuang (Yubei Square)
Island platform
     Line 10 to Houbao (Terminal 3 of Jiangbei Airport)

Exits

There are a total of 8 entrances/exits for the station.

Exit To
1 Car park
2 Terminal 1 (temporarily closed), VIP Service Area C
3 Domestic Arrivals A, Domestic Arrivals B, Long distance buses
4 Domestic Departures, Airport buses, Taxis, the Airport Cargo Terminal, VIP Service Areas A & B
5 Car park
6A Long distance buses, Domestic Arrivals A, Domestic Departures, Airport buses, Taxis
6B Long distance buses, Domestic Arrivals B, Domestic Departures, Airport buses, Taxis
7 Jinhang Road, Binggang Road, Yixue Road, The People's Government of Chongqing Yubei District

Surroundings

See also

References