Taiyuan–Xingxian railway

Taiyuan–Xingxian railway
Overview
Other name(s)太兴铁路
StatusOperating
History
Opened30 December 2014 (2014-12-30)
Technical
Line length164.26 kilometres (102.07 mi)
Route map

( Taiyuan North)
Fenhe
2.768 km
Xizhang
9.145 km
Sangei
5.000 km
Gudong
37.421 km
Gujiao
44.354 km
Zhengchengdi
54.448 km
Loufan
79.500 km
Jingyou
90.500 km
( Jingyou–Jingle railway to Jingle)
Lanxian
111.800 km
Donghui
149.700 km
Baiwen

The Taiyuan–Xingxian railway (Chinese: 太兴铁路) is a railway line in Shanxi, China.

History

Work on the line began in July 2009. In 2014, reports were published about poor quality earthworks along the line.[1][2] It opened on 30 December 2014.[3]

On 21 May 2018, passenger services were introduced on the line.[4][5]

Route

The line is 164.26 kilometres (102.07 mi) long.[1]

References

  1. ^ a b "铁总查实太兴铁路存在质量问题 责成施工方返工" (in Chinese). 中国广播网. 16 August 2014. Retrieved 18 July 2022.
  2. ^ "山西太兴铁路被指偷工减料:泥巴糊涵洞" (in Chinese). 经济参考报. 30 June 2014. Retrieved 18 July 2022.
  3. ^ "山西省"十二五"规划重点工程太兴铁路正式开通" (in Chinese). 中央政府门户网站. 30 December 2014. Retrieved 18 July 2022.
  4. ^ "太兴铁路客运今日运营" (in Chinese). Retrieved 18 July 2022.
  5. ^ "服务老区人民 推动红色旅游 助力脱贫攻坚" (in Chinese). 人民铁道网. 21 June 2018. Retrieved 18 July 2022.