Gorakhpur–Siliguri Expressway
Gorakhpur–Siliguri Expressway | |
---|---|
Route information | |
Maintained by National Highways Authority of India (NHAI) | |
Length | 519 km (322 mi) |
Existed | 2025 (expected)[1]–present |
Major junctions | |
West end | Gorakhpur, Uttar Pradesh |
East end | Siliguri, West Bengal |
Location | |
Country | India |
States | Uttar Pradesh, Bihar and West Bengal |
Major cities | Gorakhpur, Deoria, Kushinagar, Gopalganj, Bettiah, Motihari, Sitamarhi, Darbhanga, Madhubani, Supaul, Forbesganj, Araria, Kishanganj, Islampur, Bagdogra and Siliguri |
Highway system | |
Gorakhpur–Siliguri Expressway, an approved under-construction 519 km (322 mi) long, four-lane (expandable to 6) access-controlled greenfield expressway designed for speeds of up to 120 kmph running almost parallel to the India–Nepal border, will connect the Gorakhpur in Uttar Pradesh with Siliguri in West Bengal in India,[2] reducing both travel time and distance, from 14-15 hours only 8-9 hours, and from 640 km (400 mi) to 519 km (322 mi).[1] This strategic project, which will connect Eastern India to Northeast India will also benefit Nepal, is part of Bharatmala Pariyojana, and passes through three states in India, Uttar Pradesh, Bihar and West Bengal.[2] Planned future extensions include the Siliguri-Guwahati Expressway to Assam's capital Guwahati.[3][4]
History
Conception
In 2021, the plan of the expressway was proposed by the Ministry of Road Transport and Highways (MoRTH).[5]
Construction
Using Detailed Project Report (DPR) by L.N. Malviya Infra Projects Private Limited, built in Engineering, Procurement and Construction (EPC) mode, the project has several contraction packages for tender award.[6][1][7]
Construction packages by states
Uttar Pradesh
Packages | Chainages[a] | Contractor | Status |
---|---|---|---|
Package-1 | Gorakhpur Ring Road (Gorakhpur district) to Uttar Pradesh-Bihar border (0.000 km to 84.400 km) | TBD | Bidding process and land acquisition underway |
Bihar
Packages | Chainages | Contractor | Status |
---|---|---|---|
Package-1 | Junction with National Highway 27 (East-West Corridor) at Forbesganj, Araria district (361.700 km to 382.950 km) | TBD | Bidding process underway |
Package-2 | Junction with National Highway 327 at Kishanganj district to Bihar-West Bengal border (497.600 to 505.700 km) | TBD | Bidding process underway |
Package-3 | TBA | TBD | Bidding process underway |
West Bengal
Packages | Chainages | Contractor | Status |
---|---|---|---|
Package-1 | Junction with National Highway 27 (East-West Corridor) at Bagdogra, Darjeeling district (519.570 km) | TBD | DRA |
Features
Cost
Gorakhpur-Siliguri Expressway project is estimated to cost Rs 38,645 crore as per 2025 estimates, with Bihar contributing Rs 27,552 crore.[8]
Rivers and bridges
The expressway will cross several major rivers and have bridges over those, including Gandak, Bagmati and Kosi.[8]
Route
Length by states
Length by states is as follows:[9]
- Uttar Pradesh: 52.4 miles (84.3 km)[9]
- Bihar: 258.6 miles (416.2 km)[9]
- West Bengal: 11.79 miles (18.97 km)[9]
- Total: 322.85 miles (519.58 km)[9]
Route by states
Uttar Pradesh
The expressway will start from the Gorakhpur Ring Road, or National Highway 27 (East–West Corridor) (NH-27) at Gorakhpur, Gorakhpur district, and will run mostly parallel with NH-27. It will connect the following districts along with their cities:[2] It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.[8]
Bihar
The expressway will pass through the following districts along with their cities:[10] It passes through 111 villages of Gorakhpur, Kushinagar and Deoria districts of Uttar Pradesh.[8]
- Gopalganj district
- Bettiah, West Champaran district
- Motihari, East Champaran district
- Sheohar, Sheohar district
- Sitamarhi, Sitamarhi district
- Darbhanga district
- Madhubani, Madhubani district
- Supaul district
- Forbesganj, Araria district
- Araria district (continuation, will not pass through the city of Araria)
- Kishanganj district
West Bengal
The expressway will terminate again at NH-27 at Siliguri, Darjeeling district, and will pass through the following district along with its city before terminating:[2][9]
Spurs
Spurs to the following district headquarters are included in the scope of the main project:
- Uttar Pradesh
- Deoria
Planned extensions
Planned future extensions include the following:
- Siliguri-Guwahati Expressway to Assam's capital Guwahati.[3]
Inter-connectivity
- Gorakhpur: Bareilly-Gorakhpur Expressway,
which in turn connects to the Bareilly–Ludhiana Economic Corridor Expressway (includes Ambala-Shamli Expressway.[11]
Benefits
The expressway will benefit Eastern and Northeast India as well as Nepal by many ways, as follows:[12]
- Connectivity: The expressway will not only create a direct route from Gorakhpur to Northeast India, but will also connect the northeast region, along with the eastern half of Nepal, directly with the rest of India, through other expressways. For example, the connection with the national capital directly from Guwahati and Kathmandu will be created with the help of Gorakhpur–Shamli Expressway, and with the financial capital with the help of Delhi–Mumbai Expressway. This network will ensure faster, safer and better commute between the northeast region as well as Nepal.[12][8]
- Travel time and distance reduction: This expressway will reduce both travel time and distance between Gorakhpu and Siliguri, from 14-15 hours only 8-9 hours, and from 640 km (400 mi) to 519 km (322 mi).[1][13][8]
- Trade: The expressway will help to boost trade by faster transportation of cargo between Eastern and North Eastern India, as well as Nepal, while boosting he economy of 3 states of India it passes through - Uttar Pradesh, Bihar and West Bengal - and boost neighbouring Nepal's economy. In the future it will be extended to Guwahati, resulting in growth in exports and reduced dependency on imports to and from North East India.[2][8]
- Tourism: As this expressway will create a direct link from mainland India to Northeast India, it will result in a boost in tourist arrivals to northeast, as it is well known for its geography and environment. The rise in tourist arrivals will mark the growth and development of all dotted tourist attractions and destinations, including larger ones, all over the northeast region. It will also help Nepal in this respect, as it will create greater and faster accessibility, due to its proximity near the India–Nepal border.[12][8]
- Employment: Due to increase in industrial activities along the expressway's route, various agricultural and industrial initiatives will help the states' economies and growth, along with Nepal. The establishment of these numerous centres will result in multiple job possibilities for thousands of people living in both the states and the neighbouring country.[12]
- Protection of the Environment: To protect the green cover, plants and trees will be planted in between and both sides along the entire route of the expressway.[12]
Status updates
- 2022 Mar: Land acquisition began for the project.[14]
- 2023 Jan: The National Highways Authority of India (NHAI) invited tenders for the project.[15]
- 2025 Mar: Target completion date is 2028.[8]
See also
- Expressways in Bihar
- Expressways in Chhattisgarh
- Expressways of India
- National Highway 27 (East-West Corridor) (NH-27)
- India–Nepal border
Notes
References
- ^ a b c d Chadha, Vipra (11 January 2023). "Gorakhpur Siliguri Expressway - Route, Map, Benefits & Latest News". MagicBricks. Retrieved 15 March 2023.
- ^ a b c d e "NHAI proposes Gorakhpur-Siliguri expressway, awaits Bihar's nod". www.hindustantimes.com. Hindustan Times. 28 November 2021. Retrieved 26 July 2022.
- ^ a b "Gorakhpur Siliguri Expressway Project Complete Details". Times Property. 14 February 2023. Retrieved 15 March 2023.
- ^ "Gorakhpur Siliguri Expressway Route, Map, Progress and More - Infra Info Hub". 4 October 2024. Retrieved 8 October 2024.
- ^ "Gorakhpur Siliguri Expressway Project Complete Details". Times Property. 14 February 2023. Retrieved 15 March 2023.
- ^ "Nitin Gadkari announces Rs 32k cr Gorakhpur-Siliguri greenfield e-way". The Economic Times. 6 January 2022. Retrieved 15 March 2023.
- ^ "Gorakhpur – Siliguri Expressway – Information & Status". The Metro Rail Guy. Retrieved 15 March 2023.
- ^ a b c d e f g h i j k l m Gorakhpur-Siliguri Expressway: New 568-Km Route Approved; To Connect Bihar With Delhi, Northeast, Reduce Travel Time By 9 Hours, Jagran, 9 Mar 2025.
- ^ a b c d e f "Greenfield expressway: মাত্র ৬ ঘণ্টায় শিলিগুড়ি থেকে গোরখপুর! ভারতমালা প্রকল্পে তৈরি হবে গ্রিনফিল্ড এক্সপ্রেসওয়ে" (in Bengali). bangla.hindustantimes.com. Retrieved 26 July 2022.
- ^ "Gorakhpur to Siliguri 519 km long expressway dpr ready will pass through these 3 districts of UP". www.theindiaprint.com. Retrieved 26 July 2022.
- ^ Bareilly-Ludhiana Economic Corridor – Information & Status, The Metro Guy, accessed 7 December 2022.
- ^ a b c d e "Gorakhpur Siliguri Expressway Project Complete Details". Times Property. 14 February 2023. Retrieved 15 March 2023.
- ^ "Gorakhpur – Siliguri Expressway – Information & Status". The Metro Rail Guy. Retrieved 15 March 2023.
- ^ "Gorakhpur Siliguri Expressway Project Complete Details". Times Property. 14 February 2023. Retrieved 15 March 2023.
- ^ "Gorakhpur Siliguri Expressway Project Complete Details". Times Property. 14 February 2023. Retrieved 15 March 2023.