Liyuan station (Shenzhen Metro)

Liyuan

梨园
Exterior
Chinese name
Simplified Chinese梨园
Traditional Chinese梨園
Transcriptions
Standard Mandarin
Hanyu PinyinLíyuán
Yue: Cantonese
JyutpingLei4 Jyun4
General information
Location6082 Longgang Avenue (龙岗大道)
Longgang District, Shenzhen, Guangdong
China
Coordinates22°32′25″N 114°04′35″E / 22.540206°N 114.076254°E / 22.540206; 114.076254
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 3
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeElevated
AccessibleYes
History
Opened28 December 2024 (2024-12-28)
Services
Preceding station Shenzhen Metro Following station
Shuanglong Line 3 Xinsheng

Liyuan station (simplified Chinese: 梨园; traditional Chinese: 梨園; pinyin: Líyuán Zhàn; Jyutping: Lei4 Jyun4 Zaam6) is a station on Line 3 of Shenzhen Metro. It opened on 28 December 2024,[1] and is located in Longgang District. The station is an elevated station, and is also the final elevated station to be built on the whole of Shenzhen Metro.[2]

The station is part of the fourth phase of Line 3 (East Extension).[3][4]

Station layout

3F
Platforms
Platform 3 towards Futian Bonded Area (Shuanglong)
Island platform, doors will open on the left
Platform 3 towards Pingdi Liulian (Xinsheng)
2F
Concourse
Lobby Ticket Machines, Customer Service, Shops, Vending Machines
G - Exits B, C, D

Exits

Exit letter Gallery Exit location
  East side of Longgang Boulevard (N), Shenzhen Longgang Central Hospital, Longqiao New Estate, Limin Agricultural Wholesale Market
  West side of Longgang Boulevard (N), Liwan Hotel, Huancheng Square, Longgang Middle School
  North side of Longgang Boulevard (W), Sanhe Flea Market

References

  1. ^ "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-11.
  2. ^ "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 2020-07-28. Archived from the original on 2020-10-08. Retrieved 2025-01-11.
  3. ^ "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 2020-09-08. Archived from the original on 2020-10-09. Retrieved 2025-01-11.
  4. ^ "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 2020-07-24. Archived from the original on 2020-10-09. Retrieved 2025-01-11.