Line 2 |
---|
2 |
|
Locale | Lanzhou, Gansu, China |
---|
Termini | |
---|
Stations | 9 |
---|
|
Type | Rapid transit |
---|
System | Lanzhou Metro |
---|
Operator(s) | Lanzhou Rail Transit Co., Ltd. |
---|
Rolling stock | 6-car Type A |
---|
|
Opened | June 29, 2023 (2023-06-29) |
---|
|
Line length | 9.06 km (5.63 mi)[2] |
---|
Number of tracks | 2 |
---|
Character | Underground |
---|
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
---|
Operating speed | 80 km/h[3] |
---|
Line 2 of the Lanzhou Metro is a subway line in Lanzhou running from Yanbai Bridge[1] to Dongfanghong Square, has 9 stations and is 9.06 kilometres (5.63 mi) long.[2] The Phase 1 entered service on 29 June 2023.[4] An extension is planned to Xiahewan in Anning District.
History
Line 2 was planned to start construction at the end of 2015.[5] Built in phases, the first phase is 9.06 kilometers (5.6 mi)[2] with 9 stations. It will run from Yanbai Bridge to Dongfanghong Square, all within Chengguan District. The line have 2 transfer stations to Line 1, at Wulipu station and Dongfanghong Square station. The line commenced operations on 29 June 2023.[4]
In December 2017, tunnel boring for the second line commenced. The tunnel will be at depths between 6.3 metres (20 ft 8 in) and 16.8 metres (55 ft 1 in).[6]
Opening timeline
Segment |
Status |
Length |
Station(s) |
Note
|
Yanbai Bridge — Dongfanghong Square
|
In service
|
9.06 km (5.63 mi)[2]
|
9
|
Phase 1
|
Stations
References
Public transportation in Gansu Hexi Corridor Metropolitan Region (GS) |
---|
Lanzhou Metro | Lines in operation | |
---|
Planned | |
---|
|
---|
Tianshui Tram | |
---|
Zhangye Tram | |
---|
CR C-train | |
---|
Transportation hubs | Int'l airports | |
---|
Railway stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|