Korail Class 200000
Korail Class 200000 | |
---|---|
Korail Class 200000 with revised livery in 2023 | |
In service | 1 June 2009 | - present
Manufacturer | Hitachi Rail |
Family name | A-train |
Constructed | 2006–2008 |
Entered service | 2009 |
Number built | 32 carriages (8 sets) |
Number in service | 28 carriages (7 sets)[1] |
Number scrapped | 4 carriages (1 set; accident damage) (Set 2003) |
Formation | 4 cars per trainset Mc1-Tp-T-Mc2 |
Fleet numbers | 2001–2008 |
Capacity | 263 passengers[1] |
Operators | Korail |
Lines served | |
Specifications | |
Car body construction | Aluminium |
Train length | 94.0 m (308 ft 5 in)[1] |
Car length | 23.08 m (75 ft 9 in)[1] |
Width | 3.18 m (10 ft 5 in)[1] |
Height | 3.75 m (12 ft 4 in) |
Maximum speed |
|
Weight | 171 t (168 long tons; 188 short tons)[1] |
Axle load | 12 t (12 long tons; 13 short tons) |
Traction system | 2-level IGBT–VVVF (Hitachi) |
Traction motors | 8 × 250 kW 3-phase AC induction motor (Hitachi) |
Power output | 2,000 kW (2,682 hp)[1] |
Deceleration | from 150 to 0 km/h (93 to 0 mph) in 900 m (0.6 mi)[1] |
Electric system(s) | 25 kV 60 Hz AC (nominal) from overhead catenary |
Current collector(s) | Pantograph |
Bogies | Hitachi KH-221 monolink-type bolsterless bogies with yaw dampers |
Braking system(s) | Regenerative, electrical and pneumatic |
Safety system(s) | ATP, ATS |
Coupling system | Shibata |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Korail Class 200000 or TEC (Trunk-line Electric Car) is a type of electric multiple unit operated by Korail for the Nuriro services.
History
It was originally scheduled to deliver units in the summer of 2008 and start operation on 15 December of the same year with the extension of Line 1 of the Seoul Metropolitan Subway. Due to the 2008 financial crisis, the amount of foreign currency delivery more than doubled from the time of contract. The first train was delivered on 9 January 2009, and the trial operation began on 6 February. On 1 June 2009, the trains entered regular service .[2]
Gallery
-
On test in 2009
-
Trainsets being forwarded by locomotive in 2009
-
Running Nuriro services on Chungbuk Line in 2013
-
Front design in 2020
-
Pantograph
-
Doors with old livery
-
The trainsets were made by Hitachi Rail
-
Train interior in 2021
See also
References
- ^ a b c d e f g h i "홍보센터 > 기차소개 > 일반열차 > 누리로 - 한국철도공사". Korail (in Korean). Archived from the original on 19 December 2024. Retrieved 20 January 2025.
- ^ 시속 150km 친환경전동기차 ‘누리로’ 첫선, 《동아일보》, 2009.06.02.