Italian offshore patrol vessel Raimondo Montecuccoli
Raimondo Montecuccoli during RIMPAC 2024 exercise
| |
History | |
---|---|
Italy | |
Name | Raimondo Montecuccoli |
Namesake | Raimondo Montecuccoli |
Ordered | 2014 |
Builder | Fincantieri, Muggiano |
Cost | €0.5 billion |
Laid down | 8 November 2018 |
Launched | 13 March 2021 |
Commissioned | 27 September 2023 |
Identification | Pennant number: P432 |
Status | Active |
General characteristics | |
Class & type | Thaon di Revel-class offshore patrol vessel |
Type | Frigate |
Displacement | |
Length | |
Beam | 16.5 m (54 ft 2 in) |
Draught | 10.5 m (34 ft 5 in) |
Depth | 5 m (16 ft 5 in) |
Propulsion |
|
Speed |
|
Range | 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph) |
Complement | 173 beds (+ 30 on modular rear zone) |
Crew | PPA Full 120 crew;PPA Light+ + 90;PPA Light 90;( add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.) |
Sensors & processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | |
Aviation facilities |
|
Raimondo Montecuccoli (P432) is the third ship of the Thaon di Revel-class offshore patrol vessels.
Development and design
The Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missilewith also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.[1][2][3]
Construction and career
Raimondo Montecuccoli was laid down on 8 November 2018 at Fincantieri Muggiano and was launched on 13 March 2021.[4][5] She was commissioned on 27 September 2023.[6]
On 10 October 2024, the Raimondo Montecuccoli arrived at the Port of Colombo, Sri Lanka, for a formal visit under the command of Commander Alessandro Troia. The vessel departed on 13 October 2024 after completing its official engagements.[7]
References
- ^ "Un nuovo TESEO land attack per la Marina - RID Portale Difesa". Archived from the original on 14 July 2018. Retrieved 3 November 2020.
- ^ "Airpressonline.it". Archived from the original on 1 March 2020. Retrieved 3 November 2020.
- ^ "Mbda, al via lo sviluppo del nuovo Teseo". 22 March 2018.
- ^ "Keel Laying Ceremony for the third PPA Vessel | OCCAR". www.occar.int. Retrieved 15 March 2021.
- ^ Vavasseur, Xavier (13 March 2021). "Italian Navy's third PPA "Raimondo Montecuccoli" launched by Fincantieri". Naval News. Retrieved 15 March 2021.
- ^ "The Italian Navy has taken delivery of the third PPA, the Raimondo Montecuccoli". itamilradar.com. 28 September 2023. Retrieved 20 December 2024.
- ^ "Italian Navy's 'PPA MONTECUCCOLI' arrives in Colombo". Sri Lanka Navy. 20 October 2024. Archived from the original on 19 October 2024. Retrieved 20 October 2024.
External links
Media related to Raimondo Montecuccoli (P 432) at Wikimedia Commons
- Pattugliatori Polivalenti di Altura Marina Militare website