Fives–Hirson railway

Fives–Hirson Railway
Fives-Hirson railway
Overview
StatusOpen
OwnerSNCF (1938–present)
LocaleFrance (Hauts-de-France)
Termini
History
Opened1869 - 1872
Technical
Line length123 km (76 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Line to Calais
Lille-Flandres
Line to Tourcoing
to Béthune
Line to Paris
Line to Tournai
Mont-de-Terre
LGV Nord to Paris, Brussels and London
Lesquin
Fretin
Ennevelin
Templeuve
Nomain
Orchies
Landas
Rosult
Saint-Amand-les-Eaux
to Douai
Valenciennes
to Saint-Quentin
Poirier-Université
Le Quesnoy
Berlaimont
Leval
Dompierre
Saint-Hilaire
Avesnes
Avesnelles
Sains-du-Nord
Fourmies
Anor
Hirson Écoles
Hirson

The Fives–Hirson railway is a double tracked electrified railway line linking Lille-Flandres with Hirson.

History

The line opened in stages:[1]

  • Aulnoye to Hirson, 30 October 1869
  • Lille to Gare de Valenciennes, 22 June 1870
  • Valenciennes to Aulnoye, 1 September 1872

Infrastructure

Electrification was complete by 1958. The line uses automatic block signalling (BAL, Bloc Automatique Lumineux).

References

  1. ^ "Rapports et délibérations - Nord, Conseil général". Gallica. Retrieved 22 March 2014.

50°16′15″N 3°35′15″E / 50.2707°N 3.5874°E / 50.2707; 3.5874