Expressway 24 (Serbia)
Expressway 24 | ||||
---|---|---|---|---|
Serbian: Brzi put 24 Serbian Cyrillic: Брзи пут 24 | ||||
Map as of December 2019 | ||||
Route information | ||||
Major junctions | ||||
From | Batočina, | |||
To | Kragujevac | |||
Location | ||||
Country | Serbia | |||
Highway system | ||||
|
The expressway 24 (Serbian: Брзи пут 24 / Brzi put 24) is an expressway in Serbia, that links the A1 motorway with Kragujevac, at the State road 23. The section between Kragujevac and Cvetojevac has three lanes (including emergency lane) in each direction, while the rest of the route has two lanes in each direction.
Route
The construction of this route spanned over 16 years, being fully completed in October 2020.[1]
Section | Length | Status |
---|---|---|
Kragujevac – Cvetojevac | 7.5 km | In service (since 2007) |
Cvetojevac – Žirovnica | 5.6 km | In service (since 2017) |
Žirovnica – Gradac | 3 km | In service (since 2014) |
Gradac – Batočina, | 8 km | In service (since 2020) |
See also
References
- ^ Kartalović, Brane (30 October 2020). "Пут Крагујевац‒Баточина завршен после 16 година". politika.rs (in Serbian). Retrieved 29 December 2024.