Cesar Chavez/67th Street station
Cesar Chavez/67th Street | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Eastbound: 6717 Harrisburg Blvd. Westbound: 6630 Harrisburg Blvd. Houston, Texas | ||||||||||
Coordinates | 29°44′15.1″N 95°18′29.8″W / 29.737528°N 95.308278°W | ||||||||||
Owned by | Metropolitan Transit Authority of Harris County | ||||||||||
Line(s) | Green Line | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | January 11, 2017 | ||||||||||
Passengers | |||||||||||
May 2025 | 307 (avg. weekday)[1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Cesar Chavez/67th Street is a METRORail light rail station in the East End district of Houston, Texas. The station is served by the Green Line and is located in the median of Harrisburg Boulevard at South Cesar Chavez Boulevard (formerly 67th Street).
As of May 2025, Cesar Chavez/67th Street has the lowest weekend ridership of all Green Line stations, with an average of 248 riders on Saturdays and 236 riders on Sundays.[1]
Cesar Chavez/67th Street station opened on January 11, 2017 as part of the Green Line's second phase, which extended the line from Altic/Howard Hughes station to Magnolia Park Transit Center.[2]
References
- ^ a b "May 2025 (Fiscal Year 2025) Ridership Summary". METRO. Metropolitan Transit Authority of Harris County.
- ^ Begley, Dug (January 9, 2017). "Long awaited, and long delayed, Metro's Green Line set to open". Houston Chronicle. Retrieved February 2, 2017.