Cairo University station

Cairo University

جامعة القاهرة
Cairo Metro station
Cairo University station in May 2024
General information
LocationGiza Governorate
Egypt
Line(s)
Construction
AccessibleYes (Line 3 only)

Cairo University is a station in Cairo Metro that serves as an interchange station between the Cairo University branch of Line 3 and Line 2, with the station being the terminus of the former. It serves the main Cairo University campus in Giza, Egypt.

The Line 2 station was opened on 19 April 1999 as part of the extension from Sadat station, and served as the terminus before being extended to Omm El-Masryeen station.[1]

The Line 3 station was opened on 15 May 2024 as part of Phase 3C of the line.[2] The station can be accessed by three entrances: two of them from Boulak El Dakrour district to the west and another from Sudan Street and the campuses to the east. There is also a stairway-only transfer path to the original Line 2 station. The new station was constructed to reduce congestion at Attaba station and to provide additional transportation options for university students.[3][4]

References

  1. ^ "CAIRO". urbanrail.net. Retrieved 20 June 2025.
  2. ^ ""من التوفيقية إلى جامعة القاهرة".. 5 محطات مترو جديدة تدخل الخدمة | صور". Al Ahram. 15 May 2024. Retrieved 20 June 2025.
  3. ^ "محطة مترو جامعة القاهرة الجديدة تدخل الخدمة وتستقبل الجمهور خلال أيام". Youm7. 30 April 2024. Retrieved 20 June 2025.
  4. ^ "تشغيل محطة مترو جامعة القاهرة التبادلية تجريبيًا الأربعاء المقبل (تفاصيل)". Al-Masry Al-Youm. 8 May 2024. Retrieved 20 June 2025.