Bung–Van Ninh Expressway
CT.01 Expressway | |
---|---|
Bung-Van Ninh Expressway | |
Đường cao tốc Bùng–Vạn Ninh | |
Route information | |
Part of AH1 | |
Length | 48.84 km (30.35 mi) |
Status | Under construction |
Major junctions | |
North end | in Cự Nẫm, Bố Trạch |
South end | in Vạn Ninh, Quảng Ninh |
Location | |
Country | Vietnam |
Provinces | Quảng Bình |
Districts | Bố Trạch, Đồng Hới city, Quảng Ninh |
Highway system | |
The Bung–Van Ninh Expressway (Vietnamese: Đường cao tốc Bùng–Vạn Ninh) [1] is a section of the North–South Expressway East and the North–South Expressway West located in Quang Binh province.[2]
Design
The route has a total length of 48.84 km, the starting point of the road is connected to Vung Ang–Bung Expressway in Cự Nẫm, Bố Trạch, Quảng Bình and the end point is in Vạn Ninh, Quảng Ninh, Quảng Bình connect with Van Ninh–Cam Lo Expressway currently under construction. The project has a divergent phase cross-section that meets the standards of a 4-lane highway without an emergency lane, with emergency stops arranged every 4–5 km/point with a roadbed width of 17m, and a design speed of 90 km/h. In the completed phase, the road will have 6 lanes, 32.25m wide, with 2 emergency lanes, and a design speed of 100 km/h.
Construction
The route has a total investment of VND 9,361 billion, and was started on January 1, 2023. The expected construction time is 34 months.[3] The project is expected to be completed and put into use on April 30, 2025.[4]
Route details
Lanes
- 4 lanes, with emergency stops every 4–5 km/point
Length
- Total route: 48.84 km
Speed limit
- Maximum: 90 km/h
- Minimum: 60 km/h
List of interchanges and features
- IC - interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, TN - tunnel, TB - toll gate, BR - bridge
No. | Name | Dist. from Origin |
Connections | Notes | Location | ||
---|---|---|---|---|---|---|---|
Connect directly with Vung Ang–Bung Expressway | |||||||
- | Bùng IC | 625 | Under Construction | Quảng Bình | Bố Trạch | ||
1 | Cự Nẫm IC | 626.7 | Ho Chi Minh Highway | Under Construction | |||
2 | Việt Trung IC | 643.5 | Provincial Road 563 | Under Construction | |||
SA | Service Area km651 | 651 | Under Construction | Đồng Hới | |||
3 | Nhật Lệ 2 IC | 657.85 | Ho Chi Minh Highway and National Route 1 | Under Construction | |||
BR | Long Đại Bridge | ↓ | Long Đại river pass Under Construction |
Quảng Ninh | |||
4 | Vạn Ninh IC | 674.6 | National Route 9B | Under Construction | |||
Connect directly with Van Ninh–Cam Lo Expressway | |||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ^ "Decision 1454/QD-TTg 2021 approving the Road Network Planning for the period 2021-2030". thuvienphapluat.vn. Retrieved December 26, 2022.
- ^ "Decision 904/QD-BGTVT 2022 approving the component project of Bung–Van Ninh Expressway section". thuvienphapluat.vn (in Vietnamese). Retrieved May 23, 2023.
- ^ "Quang Binh starts construction of the North-South Expressway project, Bung-Van Ninh section" (in Vietnamese). Retrieved Jan 1, 2023.
- ^ "5 sections of North-South Expressway to open before April 30, 2025". voh (in Vietnamese). Retrieved Mar 18, 2025.