Bung–Van Ninh Expressway

CT.01 Expressway
Bung-Van Ninh Expressway
Đường cao tốc Bùng–Vạn Ninh
Route information
Part of AH1
Length48.84 km (30.35 mi)
StatusUnder construction
Major junctions
North end in Cự Nẫm, Bố Trạch
South end in Vạn Ninh, Quảng Ninh
Location
CountryVietnam
ProvincesQuảng Bình
DistrictsBố Trạch, Đồng Hới city, Quảng Ninh
Highway system

The Bung–Van Ninh Expressway (Vietnamese: Đường cao tốc Bùng–Vạn Ninh) [1] is a section of the North–South Expressway East and the North–South Expressway West located in Quang Binh province.[2]

Design

The route has a total length of 48.84 km, the starting point of the road is connected to Vung Ang–Bung Expressway in Cự Nẫm, Bố Trạch, Quảng Bình and the end point is in Vạn Ninh, Quảng Ninh, Quảng Bình connect with Van Ninh–Cam Lo Expressway currently under construction. The project has a divergent phase cross-section that meets the standards of a 4-lane highway without an emergency lane, with emergency stops arranged every 4–5 km/point with a roadbed width of 17m, and a design speed of 90 km/h. In the completed phase, the road will have 6 lanes, 32.25m wide, with 2 emergency lanes, and a design speed of 100 km/h.

Construction

The route has a total investment of VND 9,361 billion, and was started on January 1, 2023. The expected construction time is 34 months.[3] The project is expected to be completed and put into use on April 30, 2025.[4]

Route details

Lanes

  • 4 lanes, with emergency stops every 4–5 km/point

Length

  • Total route: 48.84 km

Speed limit

  • Maximum: 90 km/h
  • Minimum: 60 km/h

List of interchanges and features

No. Name Dist. from
Origin
Connections Notes Location
Connect directly with  Vung Ang–Bung Expressway
- Bùng IC 625 Under Construction Quảng Bình Bố Trạch
1 Cự Nẫm IC 626.7 Ho Chi Minh Highway Under Construction
2 Việt Trung IC 643.5 Provincial Road 563 Under Construction
SA Service Area km651 651 Under Construction Đồng Hới
3 Nhật Lệ 2 IC 657.85 Ho Chi Minh Highway and National Route 1 Under Construction
BR Long Đại Bridge Long Đại river pass
Under Construction
Quảng Ninh
4 Vạn Ninh IC 674.6 National Route 9B Under Construction
Connect directly with  Van Ninh–Cam Lo Expressway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ "Decision 1454/QD-TTg 2021 approving the Road Network Planning for the period 2021-2030". thuvienphapluat.vn. Retrieved December 26, 2022.
  2. ^ "Decision 904/QD-BGTVT 2022 approving the component project of Bung–Van Ninh Expressway section". thuvienphapluat.vn (in Vietnamese). Retrieved May 23, 2023.
  3. ^ "Quang Binh starts construction of the North-South Expressway project, Bung-Van Ninh section" (in Vietnamese). Retrieved Jan 1, 2023.
  4. ^ "5 sections of North-South Expressway to open before April 30, 2025". voh (in Vietnamese). Retrieved Mar 18, 2025.